Recently, Henan Mine customized 2 sets of automated EOT crane and gantry crane for a national power project. Tailored to the operational requirements of power industry scenarios, the cranes can efficiently complete automated handling of power cables for containerized substations, empowering higher quality and efficiency for power warehouses and workshop production.

Innovative Intelligent Manufacturing & Precise Positioning
This batch of cranes adopts a frequency converter + PLC electric control system. The hoisting mechanism is equipped with an encoder, and the trolley traveling mechanism applies Grey Busbar positioning technology for stable and accurate operation. Integrated with 3D scanning and visual inspection systems, the cranes support accurate material recognition, intelligent positioning, automatic grabbing, obstacle avoidance travel, and built-in anti-sway function.

Unmanned Operation, Energy-saving & High Efficiency
The whole operation process is fully automated without manual intervention. The equipment is fitted with intelligent lifting tools equipped with detection switches to fully guarantee hoisting safety. A dedicated server is deployed in the central control room, running the WCS intelligent scheduling system and WMS warehouse management system to record full-process data of material hoisting.

Intelligent Management, Safe & Reliable
It supports information tracking and data query, realizing precise control of every handling operation, and achieving intelligent, digital and refined management of power warehouse materials.
Going forward, Henan Mine will continue to deepen its layout in the power sector, iterating intelligent equipment technologies, and facilitate the intelligent upgrading of power warehouse logistics with high-end automated lifting equipment.